Tuesday 7 February 2012

Trackwork weathering.

 I was not particularly happy with the way the track colour turned out. So, as described in the last post, some more appropriate colour was purchased.
This has now been applied to the whole of the visible track and I think the result is a lot more acceptable.
The buffer stops have also been given the treatment. Once ballasted, more weathering can be applied and the lamp and buffer strip can be appropriately coloured.
Well, time to let it all dry and then ballasting can begin.

No comments:

Post a Comment